Brickwork (cubic feet)
0.00
Brickwork (cubic metres)
0.00
| Output | Unit | ||
|---|---|---|---|
| Cement | 0.00 | 0.00 | Bags |
| Sand | 0.00 | 0.00 | cum |
| Bricks | 0 | nos | |
Reference(BW)
Material Requirement for 1 cum brickwork
| Mortar | Cement (bags) | Sand (cubic metre) |
|---|---|---|
| 1:3 | 2.86 | 0.2937 |
| 1:4 | 2.09 | 0.3025 |
| 1:6 | 1:54 | 0.3289 |
| 1:8 | 1.21 | 0.3388 |